August 25, 2014 - Lodha Palava

Kalyan Shil road Welcome you to a Paradise in Mumbai

Download the E-brochure of Palava City

Kalyan Shil Road

Kalyan Shil Road

Kalyan Shil road is 3+3 lane road that connects Shil near Mumbra to Kalyan. The road is 14 kilometer in length and cuts through Dombivali to reach Kalyan. On the side of this road are beautiful landscape garden, hotels and dhaba, various housing society, etc. Kalyan Shil road is a major link road for passenger and goods. It is a link road which connects Mumbai Nasik Highway (NH3) and Mumbai Pune Expressway (NH4). The link road cuts down travelling time by 1 hour between these two Highways.

Nested along the sides of Kalyan Shil road is the Lodha Palava City. A city which is spread across 4000 acres of land and which will be the first smart city in India. Kalyan Shil Road has Casa Bella and Casa Bella Gold on the left side when a person travels from Shilphata to Kalyan and Casa Rio and Casa Rio Gold lies on the right side. Just 2 minutes walking from Kalyan Shil road will lead you to the most beautiful city Palava – The City of Opportunity. There lie two township projects of Palava City, Casa Bella and Casa Bella Gold. Casa Bella is spread across 50 acres and Casa Bella Gold is spread across 50 acres of land. On the other side of the road is Casa Rio and Casa Rio Gold. The approach road to these township is little long and it may take 5 minutes to reach the place. Casa Rio and Casa Rio Gold is a 150 acre township in Palava City. They are situated on the banks of Ulhas River.

Further travelling along this road, there will be a rail over bridge and a toll naka called as Katai Toll Naka. Ahead of this toll naka you will find Ambernath Pipeline Road on the right side. Travelling on Pipeline road will take you to a junction with Taloja bypass road. At this junction is the second phase of Palava City. The second phase is spread across 650 acres of land and is divided into 11 sectors. Lodha Group is currently developing Sector 3 of this second phase called as Lakeshore Greens. Lakeshore Greens will be completed by December, 2016 whereas phase two of Palava City will be completed by 2018.

On this same road Lodha Group will be developing phase three of Palava City. This city will be one of the top 50 cities to live in by 2025.

share

Palava Projects kalyan shil road / Lodha Palava / Palava City /

Comments

Leave a Reply

Your email address will not be published. Required fields are marked *